Flooring is the part of a job people think least about beforehand and complain about most afterwards, and in Coventry it comes down to which of two constructions is under you.
The older terraces generally have a suspended timber ground floor over a ventilated void. The air bricks feeding that void are doing a job, and the number of them that have been rendered over, planted in front of or built up against by a later extension is remarkable. Block the ventilation and the void stops breathing and the joist ends begin to go. Before anything is laid we check the ventilation still works, because a beautiful floor over a rotting one is a waste of your money.
Post-war housing has a solid floor, and there the questions are flatness and moisture rather than air movement. Most of these need levelling before a hard covering goes down. A floor out by a few millimetres over a couple of metres looks fine to the eye and shows badly in large format tiles or engineered board.
Timber needs to acclimatise in the house before it is fixed, particularly in an older building with more seasonal movement. We allow for that in the programme rather than fitting boards out of the van on the day they arrive. Our flooring page covers the coverings we fit and the preparation underneath them.