Renovation in Hinckley usually means working on the town’s late Victorian layer, and that stock has a particular character because of what it was built for.
The buildings around Druid Street went up between 1887 and 1903, during the shift from hand frames in the home to powered factory production. They were built quickly, solidly and to a pattern, which is good news for predictability and less good news for insulation: solid walls rather than cavities, and floor structures sized for the loads of the day.
Solid walls are the recurring conversation. Almost every energy improvement suggested for them has a moisture consequence if it is done without thought, and internal insulation in particular moves where the dew point sits inside the wall. We would rather explain that once, before the work, than deal with mould two winters later.
Chimney breasts come up constantly on these houses. Removing one is routine work, but not without proper support above and not without checking what is bearing on it. Structural alterations are inspected under the Building Regulations, and we arrange and meet those inspections through to sign off.
Inside a conservation area the front elevation is where the control bites, particularly on windows. Behind the building line there is far more freedom. There is more about how we phase this work on our renovation and refurbishment page.