The floor is the part of a job people think least about and complain about most afterwards, and in Lutterworth it comes down to which of two constructions you have.
Older houses generally have a suspended timber ground floor over a ventilated void. The air bricks feeding that void are doing a job, and the number of them that have been rendered over, planted in front of or built up against by a later extension is remarkable. Block them and the void stops breathing and the joist ends start to go. Before we lay anything we check the ventilation is still working, because a beautiful floor over a rotting one is a waste of your money.
Post-war and modern houses have a solid floor, and the question there is flatness and moisture rather than ventilation. Most of these floors need levelling before a hard covering goes down, and a floor that is out by a few millimetres over a couple of metres will show in large format tiles or in engineered board even though it looked fine to the eye.
Timber needs to sit in the house before it is fixed, particularly in an older building with heavier seasonal movement. We allow for that in the programme rather than fitting boards out of the van on the same day they arrived.
Our flooring page covers the coverings we fit and the preparation that goes under them.