Nuneaton & Bedworth Borough Council is the local planning authority. Planning applications and building control both go through the borough, though you can use an approved inspector for building control instead if you prefer.
Many single storey rear extensions on the interwar, post-war and modern housing around Bedworth fall within permitted development, so no planning application is needed. Permitted development is not an exemption from Building Regulations, and a full plans application is still required. We do not make that application, but we arrange and meet the inspections that follow it and we see the work through to sign off.
Ground conditions come before design
This is the part that makes Bedworth different from the towns around it. The area sits on a worked coalfield, and past underground mining is a genuine consideration for anything that involves new foundations. The way to find out about a specific address is a Coal Authority mining report, which is inexpensive and quick, and the sensible time to get one is before a design is settled rather than after a trench is open. We are not going to tell you your street is affected, because that is not something anybody can say from a photograph. We are going to tell you that finding out is cheap and that guessing is not.
Conservation areas and Article 4 directions
The borough has five conservation areas: Bedworth Town Centre, Nuneaton Town Centre, Abbey, Bulkington village and Hawkesbury Junction, with 91 listed buildings across the borough. The council has also made Article 4 directions covering Bermuda Village, Bulkington, the Abbey conservation area and Hollyhurst Farm. Where one applies, things normally permitted, such as replacing windows or altering a frontage, need permission first. We check the designation before anything is drawn.
Party walls
The colliery terraces and the Victorian housing were built tight, so shared boundaries are close more often than not. If work comes near or against one you are likely to need a party wall award, and we raise that at quotation stage rather than three weeks into the dig.