Floors in Warwick’s older buildings are usually the most altered part of the structure, because every trade for three hundred years has been through them.
A suspended timber floor in a post fire building will have been notched, drilled and patched by generations of plumbers and electricians, and the cumulative effect is a floor that bounces, squeaks or slopes. Levelling compound does not fix any of that. We look at why a floor is doing what it does before deciding what to put on it, because a beautiful covering over a tired structure is money spent on the wrong thing.
Sub-floor ventilation is the other historic issue. The air bricks are doing a job and in the centre of town they have frequently been covered by a raised pavement, a later render or a neighbour’s alteration. Block the ventilation and the joist ends go. We check before laying anything.
Original floorboards are worth more than most people assume, and in a listed building lifting or replacing them can be a consent matter. Where boards are sound we would rather lift, clean and relay than skip them.
Later housing has solid floors where flatness and moisture are the questions, and most need levelling before a hard covering. Our flooring page covers the preparation underneath the finish.